Bressummer Ark was appointed by a commercial landlord to manage a programme of maintenance, repairs and fire safety improvements at a mixed-use property in Salisbury’s conservation area. From preparing the specification and tendering the works to overseeing the project on site, we managed the repairs through to completion while the building remained occupied.
Service: Project Consultancy
Client: Commercial Landlord
Sector: Retail / Mixed-use
Project Value: Under £50,000
Programme: 4 weeks – October 2026
Bressummer Ark was appointed by a commercial landlord to manage a programme of repairs and fire safety improvements at a mixed-use property on Catherine Street, Salisbury.
The building, located within Salisbury’s conservation area, comprises a ground-floor retail unit with residential flats above. A number of maintenance issues had built up over time, including repairs needed to the roof, windows and external timberwork. A fire risk assessment had also identified areas where fire separation needed improving.
With the property fully occupied, the landlord needed the works to be properly planned, competitively tendered and managed with minimal disruption to the tenants.
We were appointed to manage the project from the initial inspection through to completion.
Following a survey of the property, we prepared a specification covering the necessary external and internal repairs, alongside the fire safety improvements identified in the fire risk assessment.
One of the more significant issues was a rear dormer that had started to sag. We sought advice from a consultant structural engineer to establish the appropriate repairs, which were then incorporated into the specification.
Once the scope of works had been agreed, we invited local contractors to tender and reviewed their submissions before recommending a suitable contractor to the client.
We then administered the contract, carrying out regular site inspections to monitor progress and check the quality of the work.
The project covered a range of maintenance and repair items, including:
One of the main considerations was that both the shop and residential flats remained occupied throughout the works.
Access arrangements and working hours were agreed in advance, with regular communication between the contractor and tenants to help minimise disruption.
The building’s location within a conservation area also needed to be taken into account. Wherever possible, the specification focused on repairing existing features rather than replacing them, using materials and finishes appropriate to the property.
The fire safety works required particular attention, given the combination of commercial and residential accommodation. The findings of the fire risk assessment were incorporated into the specification to ensure the necessary improvements were carried out as part of the wider maintenance programme.
The works were completed within the four-week programme in October 2026.
The project addressed the outstanding maintenance issues, improved fire safety and dealt with the structural concerns surrounding the rear dormer.
By bringing the various repairs together into one coordinated programme, the landlord was able to address several issues at once, rather than dealing with individual defects as they became more serious.
Throughout the project, the property remained occupied, and the repairs were completed with consideration for both the tenants and the building’s conservation area setting.
Backlog maintenance refers to repairs that have been delayed or left outstanding over time. These can range from minor defects, such as damaged roof slates or deteriorating paintwork, to more substantial repairs. If left unattended, relatively small issues can lead to more expensive problems.
Yes. Many maintenance and refurbishment projects take place in occupied buildings. The important thing is to plan the works properly, agree access arrangements and keep tenants informed throughout.
If a dormer is showing signs of movement or sagging, it’s worth seeking structural advice before carrying out repairs. A structural engineer can help establish the cause and recommend an appropriate solution.
Yes, although care needs to be taken with the materials and methods used. Depending on the building and the nature of the works, planning permission or listed building consent may be required.
A contract administrator manages the building contract on behalf of the client. This typically includes monitoring progress, inspecting the works, managing variations and overseeing the contractual process through to completion.
Bressummer Ark provides project management and contract administration services for commercial and mixed-use properties across Salisbury, Wiltshire and the wider South of England.
We work with landlords, property owners and investors on projects ranging from individual repairs and planned maintenance through to larger refurbishment programmes.
Our involvement can cover everything from the initial building inspection and preparation of specifications to contractor tendering and overseeing works on site.
If you have a commercial property with outstanding maintenance issues or repairs that need managing, we can help you establish what needs doing and the best way to approach it.
Whether it’s a single repair or a wider programme of works, we provide practical advice and manage the process on your behalf.
Speak to our team to discuss your property and how we can help.
It’s important, in order for us to understand your requirements from the outset in order to give the best commercial building consultancy advice we can.
Contact a Surveyor Today